Manufacturing

The Project Layer Around the Plant

New product introduction, line changeovers, maintenance shutdowns, and capex work in one place. Your ERP runs production. This runs the projects around it.

Recommended editionsCloudSelf-HostedOpen Source

Free forever plan · No credit card required · Set up in minutes

What manufacturing project management covers

An ERP tells you what is being made and what it costs. Neither an ERP nor an MES is good at the work around production: bringing a new product to the line, planning a changeover, running a shutdown, or getting a capex project through approvals. That work crosses engineering, quality, maintenance, and procurement, and it usually lives in spreadsheets and a weekly meeting. Orangescrum is the project layer for it, and it does not try to be your ERP.

The problem

Why plant projects slip

NPI runs on a spreadsheet and a meeting
The gate review is the only moment anyone sees real status, and by then a launch date has already moved.
A live plan with milestones for each gate.
Changeovers overrun
Steps that must happen in order are tracked on a whiteboard, so one slip is discovered on the day it bites.
A Gantt schedule where linked work moves together.
Engineering and the floor are apart
Per seat licenses mean the people doing the work never see the plan, and hear about changes second hand.
Unlimited users with role based access.
Quality evidence is chased afterwards
Sign offs are collected once an auditor asks, from people who have moved on to the next job.
Approvals and activity history recorded as the work happens.
What matters here

Sequence, sign off, and every function included

  • NPI and stage gates

    Run new product introduction as a project with a milestone for each gate, so status is visible between reviews.

  • Sequenced work

    A Gantt timeline with dependencies for changeovers and shutdowns, so one slip shows you everything behind it.

  • Checklists and sign off

    Handover, safety, and quality steps captured on the task rather than on a clipboard that gets filed.

  • Capex and project cost

    A budget per project with actual cost building from logged work. Pro and above in Cloud.

  • Controlled documents

    Versioned documents with approvals, so which procedure is current is not open to debate. Self-Hosted.

  • Everyone on the plan

    Unlimited users on every plan, so maintenance, quality, and production staff are inside the tool.

How it works

How a plant project is run

1
Pick the project types
NPI, shutdowns, changeovers, and capex. Each one gets a template rather than a fresh spreadsheet.
2
Build the sequence
Lay the work on a timeline and link what genuinely has to happen in order.
3
Bring in the other functions
Engineering, quality, maintenance, and procurement, each with access to their own part.
4
Keep the evidence
Approvals and a permanent activity history are recorded while the work happens, not afterwards.
Who it's for

Where manufacturers use it

New product introduction
Stage gates and cross function work in one plan.
Learn more →
Maintenance and shutdowns
Sequenced work where a slip is visible immediately.
Learn more →
Capex and plant projects
Budget, committed spend, and variance against it.
Learn more →
Availability

Which edition includes what

Orangescrum runs as managed cloud, self-hosted on your own servers, or as the open-source Community Edition. Here is exactly what each one includes.
Available in Cloud and Self-Hosted. Cost tracking is Pro and above in Cloud.
CapabilityCloudManaged SaaSSelf-HostedOn-premise / private cloudOpen SourceCommunity Edition
Projects, tasks, and boards
Milestones for stage gates
Gantt schedule and dependencies
Budget and project costPro
Resource managementPremium
Document management with approvals
Risk management
Runs on your own infrastructure
Frequently asked questions

Manufacturing project management FAQ

Is Orangescrum an ERP or an MES?

No, and it does not try to be. There is no MRP, no inventory or stock control, no warehouse management, no shop floor control, and no production scheduling against machines or work centres. Orangescrum manages the projects around production, and it sits alongside whatever runs your plant.

Can we run NPI stage gates in it?

Yes. Each gate becomes a milestone, the work for each phase sits underneath it, and checklists capture the criteria that have to be met before the gate is passed. Because the work is live rather than in a deck, status between reviews is visible instead of being assembled the night before.

Can we plan a shutdown or a line changeover?

Yes. Build the sequence on a Gantt timeline with real dependencies, so when one task runs long you can see exactly what moves behind it. Critical path shows which chain of work actually decides when the line restarts, and that is Premium in Cloud or included in Self-Hosted.

Do we pay for every person on the plant floor?

No. Every plan includes unlimited users on a flat monthly price, which is the point for manufacturing: maintenance technicians, quality inspectors, and shift supervisors can all be in the plan instead of being told about it later.

Can we track project cost?

Yes, at the project level. Set a budget, define rates, and actual cost builds from logged work, with variance visible while there is still time to act. This is project cost, not product costing or standard cost accounting, and it is not a general ledger, so it does not replace your finance system.

Can we keep everything on our own servers?

Yes. The Self-Hosted edition installs on your own infrastructure, including a restricted or air gapped plant network, with SSO, LDAP, and Active Directory sign in. Many manufacturers choose this because customer and design data cannot leave the site.

Can we manage risk on a project?

Yes, in the Self-Hosted edition, which includes a risk register where risks are recorded, owned, scored, and tracked with mitigation actions. Risk management is not available in the Cloud edition, so it is worth factoring into your deployment choice.

Can we reuse a plan for the next line or site?

Yes. Project templates let you carry a proven plan into the next installation or changeover instead of rebuilding it, and programme management groups the projects across sites so you can see the whole rollout with progress and cost rolled up.