A Project Calendar That Shows What Lands When
A board tells you what state work is in. A calendar tells you when it is due, and warns you about the week that has eleven deadlines in it.
Free forever plan · No credit card required · Set up in minutes
What is a project calendar?
A project calendar shows tasks on dates rather than in a list or a board. It is the fastest way to spot a bad week before it arrives, because a pile up is obvious visually in a way it never is in a task list. In Orangescrum the calendar is another view of the same tasks, so nothing is entered twice, and work with a start date and a due date is drawn as a bar across the days it actually occupies.
Why deadlines surprise people
Your work, on dates
01Events
Milestones and deadlines
The dates that matter stand out from ordinary task due dates.
02Views
Month and week
Read the calendar as a whole month or as a single week, with previous, next, and today.
One project or all of them
Look at a single project, or switch to every project you can see and catch clashes between them.
A modern month grid
The Community Edition adds a lighter month page that starts the week on Monday and tints tasks by status.
Work with no date
That page also lists undated tasks under the grid, so nothing hides by having no deadline.
It is a saved default
The calendar can be set as the view you land on, so it is where your day starts.
03Events
A bar across the real days
A task with a start date and a due date is drawn across every day between them, not just on the deadline.
One day when that is all you have
A task with only a start or only a due date takes a single day, and one with neither falls back to the day it was created.
Coloured by your statuses
Each task takes the color of its status from your own workflow, so the month reads at a glance.
Who owns it
Every event carries the assignee's avatar and names them on hover.
Subtasks are marked
A subtask is flagged as one, so a busy day is not misread as ten separate pieces of work.
Which project it came from
In the all projects view each event carries its project short name and task number.
Open the task from the day
Click anything on the calendar to open the full task without leaving the month.
04Scheduling
Drag to reschedule
Move a task to a different day by dragging it, and both its start and due dates move together.
It refuses a bad move
A drop into the past, before the task existed, or onto a resolved or closed task is rejected and snaps back.
Create work on a day
Drag across empty days to open a new task with those dates already filled in, if you may create tasks.
A warning when they are full
If the assignee has no room on the day you dropped it, the calendar says so instead of letting you find out later.
A reason when a date moves
The Cloud sprint calendar asks why a due date changed and keeps the answer on the task.
It updates as others work
The Cloud sprint calendar redraws when a teammate changes a date, without a refresh.
05Filters
The same filters as the board
Project, status, priority, type, label, assignee, and member all narrow the calendar.
Epics, features, and groups
Cut the month down to an epic, a feature, a milestone, a task group, or a skill.
Search and date ranges
Search by keyword, and filter by created date or due date range.
Reuse a saved one
Apply a filter you already saved elsewhere instead of building it again on the calendar.
06Time
Month, week, and day
A second calendar shows logged time, and this one does have a day view.
Totals for what you are looking at
Total, billable, and non billable hours for the visible range sit above the grid.
Log against a day
Click a day to add a time entry already dated, with the start and end times filled in from the week and day views.
Edit an entry in place
Click a logged entry to open and correct it, if you may edit time logs.
Export the timesheet
Send the visible time entries straight out as CSV from the calendar toolbar.
07More
A release calendar
Releases sit on their own month grid with type and status filters, and are ticked when they actually ship. Available in Self-Hosted.
The team's month
An attendance and leave grid puts every person against every day, aware of weekends and your company holidays. Available in Self-Hosted.
Your working calendar
Company holidays and the working week are configured once and shade the timesheet grids.
Two way Outlook sync
Map an Outlook calendar and sync either way or both, with events becoming tasks and tasks becoming events. Available in Self-Hosted.
08Access
Its own permission
Seeing the calendar is a separate right, so you can give it to the people who need dates and not to everyone.
Unlimited users
Every paid plan includes unlimited users, so everyone whose week is on the calendar can actually open it.
How teams use it
For work that is driven by dates
Which edition includes what
| Capability | CloudManaged SaaS | Self-HostedOn-premise / private cloud | Open SourceCommunity Edition |
|---|---|---|---|
| Milestones on the calendar | ✓ | ✓ | ✗ |
| Calendar view of tasks | ✓ | ✓ | ✓ |
| Month and week views | ✓ | ✓ | ✓ |
| Drag to reschedule | ✓ | ✓ | ✓ |
| Filter by person, project, or epic | ✓ | ✓ | ✓ |
| Time log calendar with CSV export | ✓ | ✓ | ✓ |
| Over-booking warning on a drop | ✓ | ✓ | ✗ |
| Realtime updates and due date reasons | ✓ | ✗ | ✗ |
| Release calendar | ✗ | ✓ | ✗ |
| Attendance and leave team grid | ✗ | ✓ | ✗ |
| Two way Outlook calendar sync | ✗ | ✓ | ✗ |
Project calendar FAQ
Does Orangescrum have a calendar view?
Yes. The calendar is one of the standard task views, alongside the list and the Kanban board. Tasks appear on their dates, and you can drag them to reschedule.
Does a task show on one day or across several?
Across several. A task with a start date and a due date is drawn as a bar over every day between them, so a two week piece of work looks like two weeks. A task with only one date takes a single day.
Is the calendar in the free edition?
Yes. The calendar view is available in every edition, including the free and open source Community Edition, which also adds a lighter month page listing undated work below the grid.
Can I move a deadline by dragging?
Yes. Drag the task to a new day and its start and due dates move together on the task itself, so the board and reports stay in step. Drops into the past, before the task was created, or onto closed work are refused.
Will it stop me overloading someone?
It will warn you. If you drop a task onto a day where the assignee has no capacity left, Cloud and Self-Hosted tell you at that moment rather than letting the clash sit there.
Can I see one person's calendar?
Yes. Filter by assignee to see just their work, which is the quickest way to check whether someone's week is realistic before committing them to more.
Can I see several projects on one calendar?
Yes. Switch to the all projects view to catch two projects both landing on the same person in the same week.
Do milestones appear on the calendar?
Milestones are a filter on the calendar rather than events drawn on it, so you can narrow the month to one milestone's work. For milestone and sprint dates as a timeline, use the Gantt chart.
Can I log time from the calendar?
Yes. There is a second calendar for time, with month, week, and day views, running totals for billable and non billable hours, click a day to log time, click an entry to correct it, and a CSV export.
What is the difference between the calendar and the Gantt chart?
The calendar shows when things are due, which is best for spotting a busy week. The Gantt chart shows how long things take and what depends on what, which is best for planning a sequence. They are two views of the same tasks.
Does it sync with an external calendar?
The Self-Hosted edition includes a two way Outlook calendar integration, where you map a calendar and choose whether events flow in, tasks flow out, or both. Otherwise the calendar lives inside Orangescrum.
See the week before it hits you
The calendar view is in every edition, including the free Community Edition.