Resource-Constrained Scheduling, Explained Properly
A plan that ignores who is available is a wish with dates on it. Here is how to schedule around real capacity, and a straight account of what Orangescrum does and does not automate.
What is resource-constrained scheduling?
Resource-constrained scheduling means building a schedule around the people and equipment you actually have, rather than around dates and dependencies alone. An ordinary plan assumes a task can start as soon as the work before it is finished. A resource-constrained plan adds a second rule: it can only start if somebody is free to do it. Adding that rule almost always pushes the finish date out, which is uncomfortable and also true. In classic project management the technique is paired with resource levelling, where a scheduling algorithm shifts tasks within their slack until nobody is over-allocated, and with resource smoothing, which does the same without moving the end date.
Where capacity quietly breaks the plan
- The plan assumes everyone is fully availableFive days a week of project work per person, with nothing subtracted for meetings, support duty, interviews, or the other project they are also on.
- Over-allocation is discovered by the person, not the plannerThe engineer notices they are booked twice, tells nobody, quietly picks one, and the other task slips silently until somebody chases it.
- One scarce skill sets the whole dateThere is a single person who can do the database work or the design. The plan is drawn as if that skill were plentiful, so every estimate downstream is wrong.
- Approved leave is nowhere in the scheduleSomeone books a fortnight off, it is approved, and the plan still shows them working through the middle of it on a task with no slack.
What Orangescrum actually gives you
Real features, named. Nothing here is an algorithm that decides for you.
How to schedule around real capacity
- Start from availability, not headcountTake each person's week and subtract leave, meetings, support duty, and time on other projects. The usable figure is almost always well below five days.
- Name your scarce skillsIdentify the skills only one or two people have. Those people are your constraint, and the realistic schedule is really their schedule.
- Schedule the constraint firstBook the scarce person's work before you plan anything around it. Planning everything else first and hoping they fit is how the date slips.
- Look at the workload view before you publishCheck the heat map for anyone over capacity. A plan published with visible over-allocation will be broken by the second week, and everybody will already know.
- Rebalance by hand, then check againMove a task, reassign it, or move a date. Then look at the heat map once more, because fixing one collision routinely creates another somewhere else.
What Orangescrum does not do here
This is the page where the gap matters most, so it is worth stating flatly. Classic resource-constrained scheduling assumes resource levelling, where an algorithm shifts tasks within their slack until nobody is over-allocated. Orangescrum does not do that. There is no levelling engine, no scheduling solver, and nothing that moves your tasks to resolve an over-allocation. What it does is surface the problem: the workload heat map shows who is over-committed and when, resource management shows availability and allocation, and in Self-Hosted approved leave reduces the capacity you plan against. A human then rebalances, by reassigning, resequencing, or moving a date. If you need genuine automated levelling across a large constraint set, that is specialist scheduling software and you would run it alongside us. Resource management and the workload heat map are on the Cloud Premium plan and included in Self-Hosted.
Resource-constrained scheduling <em>FAQ</em>
Does Orangescrum automatically level resources?
What is the difference between resource levelling and resource smoothing?
How do I find over-allocation?
Does approved leave reduce capacity automatically?
Which plan or edition do I need for this?
Should I plan people at one hundred per cent?
What do I do when the constrained plan misses the deadline?
Is this the same as critical chain?